0-1 Quadratic programming approach for optimum solutions of two scheduling problems
ALIDAEE, BAHRAM; KOCHENBERGER, GARY A.; AHMADIAN, AHMAD; ALIDAEE, BAHRAM; Mathematics and Physical Sciences Department, West Texas State University; KOCHENBERGER, GARY A.; College of Business Administration, University of Colorado at Denver; AHMADIAN, AHMAD; Management Department, University of Southern Colorado
Журнал:
International Journal of Systems Science
Дата:
1994
Аннотация:
Two scheduling problems are considered: (1) scheduling n jobs non-preemptively on a single machine to minimize total weighted earliness and tardiness (WET); (2) scheduling n jobs non-preemptively on two parallel identical processors to minimize weighted mean flow time. In the second problem, a pre-ordering of the jobs is assumed that must be satisfied for any set of jobs scheduled on each specific machine. Both problems are known to be NP-complete. A 0-1 quadratic assignment formulation of the problems is presented. An equivalent 0-1 mixed integer linear programming approach for the problems are considered and a numerical example is given. The formulations presented enable one to use optimal and heuristic available algorithms of 0-1 quadratic assignment for the problems considered here.
227.6Кб